Lyon plans to create a public swimming area in the Confluence basin by 2027, aiming to blend urban recreation with environmental awareness.
Deputy mayor supports new swimming area
Julie Nublat-Faure, the deputy mayor for sports in Lyon, has endorsed the Metropolis of Lyon's plan to create a public swimming area in the Confluence basin by 2027. She believes the decision may have been influenced by concerns about climate change and the desire to use natural water bodies for recreation, a practice that has historical roots in the city.Historical and regional context
Nublat-Faure highlighted that the Metropolis of Lyon's president acknowledged the significance of the project, which includes similar swimming initiatives along the Rhône near Gerland and other areas along the Saône. However, the Metropolis had previously expressed doubts, with some officials, like Pierre Oliver, indicating they were hesitant to proceed.Safety and operational details
The Metropolis reportedly received assurances from the City of Lyon regarding the safety of the project, which Nublat-Faure said were already part of the planning. Safety measures include maintaining public tranquility and preventing misuse at night, with plans to have guards present day and night and to consult with local residents on operating hours.Project scope and limitations
The swimming area will be open only during the summer and will be fully dismantled afterward, returning the basin to its original state. It will accommodate up to 300 people at the same time, though daily attendance could reach 1,000 or 1,500, depending on the day. The exact schedule, including opening times, is still being discussed with local residents.Future plans and challenges
A second swimming project is planned for the Gerland area near the Pasteur bridge, though its exact location is not yet determined. This project may have a larger capacity but will require additional studies, especially regarding the Rhône's water quality, which differs from the Saône due to its current and commercial use. The Confluence project took five years to develop, including two years of water analysis, and similar long-term planning will be needed for future projects.