SMAE has located a sea-line 2 leak near the shore and plans repairs to restore water supply, but service may remain unstable for 2-3 days.
Leak location identified
SMAE (Mahoraise des Eaux) has pinpointed the exact location of a leak at the sea-line 2 level, about 150 meters from the shore on the side of the Committee of Tourism. This discovery allows for targeted repairs to be carried out.Repairs and service timeline
The repair work is scheduled for tomorrow, Tuesday, October 20, which should allow for a gradual resumption of the water supply. However, the system is expected to remain fragile for the next two to three days, potentially leading to a failure to meet the standard 30-hour service duration.Water supply schedule details
During the restoration period, the water supply schedule will vary by sector. Sector 2, which includes the Labattoir Badamiers area, was opened on Monday, October 19, at 12:00 and is scheduled to close on Tuesday, October 20, at 7:00.Sector updates and changes
Sector 1, covering areas such as Labattoir Centre, Pamandzi Est, and Pamandzi La Vigie, is set to open on Tuesday, October 20, at 12:00 and close on Wednesday, October 21, at 14:00, though this may change. Sector 3, which includes parts of Pamandzi and Dzaoudzi, has seen partial restorations with varying timelines.User guidelines for water use
SMAE advises residents during the water restoration period to close all taps in their homes and allow water to run slowly for the first few minutes. They should also let the water run until it is clear, collecting it in a container for non-potable use.Safety precautions for drinking water
For potable use, such as drinking and cooking, SMAE recommends boiling the water for the first half-day after the water restoration. This precaution ensures the water is safe for consumption during the initial phase of the restoration.